UK-WIDE DRYLINING SUBCONTRACTOR · EST. 2022

Framed. Boarded. Finished.

JSM VK LTD supplies experienced drylining teams — metal stud partitions, plasterboard linings, suspended ceilings, and taping and jointing — to main contractors across Scotland and the UK.

10+
Years’ experience
40+
Skilled operatives
2022
Year established
3
Live sites

ABOUT US IN 2 MINUTES

Who we are and how we work.

A short look at our teams, how we fit into a main contractor's programme, and the sites we're on right now.

BUILT LIKE OUR WALLS

Watch a room come together.

Trusted by companies such as:
  • Linear
  • SMG
  • NAB
  • CCL
  • MMM

WHAT WE DO

One subcontractor for the whole interior package.

Established as JSM VK LTD in 2022 and built on more than ten years of hands-on drylining experience across our team.

All services

Partitions & wall linings

Metal stud partitions and wall linings, including fire-rated and acoustic systems, set out and built to programme.

Ceilings & bulkheads

MF and suspended grid ceilings, bulkheads and feature ceilings, from first fix to final board.

Taping, jointing & finishing

Clean, level finishes on walls and ceilings, handed over ready for decoration.

Firestopping

Service penetrations through fire-rated walls and ceilings sealed to the required specification.

FROM FIRST FIX TO FINISH

How our teams build an interior.

Real photos from our live sites, stage by stage. Watch it play, or tap any stage.

Setting out and framingCeilingServices and pattressesInsulationBoardingFire-rated liningsTaping and jointingFinished interior01

ON SITE NOW

Our teams at work.

Cutting track to the laser lines
Cutting track to the laser lines
Cutting and fitting boards
Cutting and fitting boards
Fixing at height from a MEWP
Fixing at height from a MEWP
Checking drawings on site
Checking drawings on site
Measuring before fixing
Measuring before fixing
Slatted timber ceiling in a visitor centre
Slatted timber ceiling in a visitor centre

HOW WE WORK

From drawings to handover, one team.

A clear, straightforward process, so your site team always knows where the package stands.

  1. 01

    Enquiry

    Send us the drawings, specification and programme for the package.

  2. 02

    Pricing

    Our quantity surveyors price the works, with inclusions and exclusions set out clearly.

  3. 03

    Mobilisation

    We plan labour and materials, and agree the start date and sequence with your site team.

  4. 04

    Installation

    A dedicated supervisor leads our teams on site, floor by floor, working to approved RAMS.

  5. 05

    Handover

    Snags are closed out area by area, leaving each floor ready for the following trades.

COMPLIANCE

Site-ready from day one.

  • CSCS-carded teams
  • IPAF & PASMA trained operatives
  • Employer’s & Public Liability insured
  • CIS-registered with HMRC
  • RAMS for every package
  • First Aid & Asbestos Awareness trained managers

GET IN TOUCH

Discuss your next project.

Send us the scope, programme and start date, and we’ll come back to you with our availability across Scotland and the UK.

WhatsApp us